Getting the keys to your new flat is a big day. But before you start interiors, take a few hours to check the flat carefully. Problems like seepage, hollow tiles or loose electrical points are easy for the builder to fix before you move in, and expensive and messy to fix after your kitchen and wardrobes are installed.
This is the simple, room-by-room new flat handover checklist we recommend to families in Hyderabad, from gated communities to standalone apartments.
Quick answer: At handover, check walls and ceilings for cracks and damp patches, tap every floor tile for a hollow sound, test every tap, drain, switch and socket, open and close every door and window, check the balcony and bathroom floor slope, and collect all documents, keys and warranties. Write every problem on the builder’s snag list and get it fixed before interior work begins.
What to carry on handover day
- A copy of your flat’s plan and the builder’s specification sheet
- A phone charger or small plug-in tester (to check every socket)
- A torch (to look into corners, ducts and under the sink)
- A bucket of water (to check bathroom and balcony slopes)
- A measuring tape
- Masking tape or sticky notes to mark problems, and your phone to take photos
Room-by-room handover checklist
| Area | What to check |
|---|---|
| Walls and ceilings | Cracks, damp patches, peeling paint, uneven plaster. Look closely near windows, bathrooms and the ceiling below the upper floor’s bathroom |
| Flooring | Tap tiles gently. A hollow sound means the tile isn’t fixed properly. Check for chipped tiles, uneven joints and level differences between rooms |
| Doors | Each door opens and closes smoothly, locks properly and doesn’t scrape the floor. Check the main door’s lock, hinges and finish |
| Windows | Smooth sliding, locks work, no gaps around the frame, glass has no cracks. Check for water marks below windows |
| Electrical | Test every socket and switch. Check the main board (MCBs), the earthing, AC points, geyser point and the inverter wiring, if provided |
| Kitchen | Platform is level and firm, sink drains fast, water inlet and outlet for the water purifier and washing machine are in place, chimney point and exhaust opening are provided |
| Bathrooms | Run every tap and shower. Pour water on the floor and check that it flows to the drain. Check the flush, geyser point, exhaust fan and any leaks under the washbasin |
| Balconies and utility | Floor slopes towards the drain, railing is firm, the waterproofing looks intact and there is a drain outlet |
| Plumbing ducts | Look into the shafts with a torch for leaks or wet patches |
Documents and keys to collect
- Possession or handover letter
- All keys: main door, bedrooms, bathrooms, balcony and the letter box
- Copies of warranties for doors, windows, fittings and any appliances provided
- Electricity and water connection details, and meter readings on the day of handover
- Car parking allotment details
- The builder’s or association’s contact for complaints and snag fixes
If you are unsure about any legal or registration document, check with your lawyer or the builder’s CRM team.
How to raise a snag list
- Mark every problem with tape and take a clear photo.
- Write it down room by room: for example, “Bedroom 2: hollow tile near window; switch board loose.”
- Submit the list in writing to the builder or CRM team and keep a copy.
- Re-check after the repair, before you sign off and before interior work starts.
Before you start interiors: 6 things to plan
- Fix all seepage first. Woodwork on a damp wall can swell and get damaged. Wait until the wall is completely dry.
- Measure every room. Note the wall lengths, window positions and ceiling height. Your interior designer will measure again, but it helps you plan.
- Plan electrical changes early. Extra sockets, TV wall points, wardrobe lights and false ceiling lights should be decided before anything else.
- Decide the kitchen layout. Check where the sink, hob, chimney, fridge and water purifier will go.
- Check your society’s rules. Many gated communities have working hours, noise rules and a deposit for interior work.
- Get a clear quotation. Ask for an itemised quote, with materials and brands, before you pay anything.
To see how long the full interior process takes, read our interior design timeline. For budgets, see our 2BHK cost guide and 3BHK cost guide.
Frequently asked questions
How long does a flat handover inspection take?
For a 2BHK or 3BHK, plan for 2–3 hours. Go in daylight so you can see cracks and damp patches clearly.
Can I start interiors before the builder fixes the snags?
It’s better not to. Once the kitchen and wardrobes are installed, fixing seepage, tiles or wiring behind them is much harder and can damage your new interiors.
What is the most common problem in new flats?
Hollow tiles, small wall cracks and seepage near bathrooms and windows are the most common. They are usually easy for the builder to fix if you report them early.
Should my interior designer check the flat too?
Yes. During the site visit, a good interior designer will check walls, electrical points and plumbing positions, because these affect the design.
Just got the keys to your new flat?
Book a free site visit within 1 day. We’ll check the flat with you, take measurements and share a clear quotation the same day. See our full home interiors service.
